Yes, I think that sounds reasonable. We can probably get the kitchen cabinets measured by next Tuesday if the contractor confirms. I already spoke with both suppliers about the oak versus maple options, and they said they'd send samples by end of week. The tiles we looked at last Saturday would work well for the backsplash, though the grout color selection still needs to be finalized. Also, remind me to call the electrician about the under-cabinet lighting layout before we order the countertops. Let me know if you want to adjust the timeline for the island installation. I can shift some things around if needed.
|
I checked in with the venue coordinator again and she confirmed the July dates are still open. The deposit would be half of the total, and the remainder is due two weeks before the event. They can also provide tables and basic linens if we need them. I think we should decide on the menu options before the end of the month so the caterer can order enough ingredients. We also need to arrange a parking plan since the lot is small. Maybe we can ask some of the neighbors to use the church lot across the street. Let me know what you think about the timing for the band setup. I can reach out to them tomorrow.



